Hot water installations of water of UVN, VGU is applied to heating of the sea water used at washing of oil wells from paraffin. It is installed in an open area. The water installation is operated in two modes-summer and winter.
Category: All
Tags: Product, Water heating installations
Related products
-
Rated 0 out of 5
The manifold unit is designed for tying pumping units with the wellhead during well cementing, hydraulic fracturing, and other flushing and sales operations.
-
Rated 0 out of 5
Technical characteristics and parameters Name of the working parameter Unit Value Length Width Height mm mm mm 11360 2600 2750
-
Rated 0 out of 5
The 3×4 working platform is intended for carrying out work during major well repairs using lifts A-50, UPA-60 and other lifts intended for well repairs.
Reviews
There are no reviews yet.