Hot water installations of water of UVN, VGU is applied to heating of the sea water used at washing of oil wells from paraffin. It is installed in an open area. The water installation is operated in two modes-summer and winter.
Category: All
Tags: Product, Water heating installations
Related products
-
Rated 0 out of 5
According to the standard ST AO 970740000987-001-2020 The gas-filling anchor is attached to the lower coupling of the lock support of the plug-in pump using…
-
Rated 0 out of 5
According to the standards СТ РК ГОСТ Р 50278-2010, 51245-2005, СТ РК ИСО 11961-2009, ГОСТ 631-75, 8467-83, 7909-56, API spec 7.2 HS Code …
-
Rated 0 out of 5
The manifold unit is designed for tying pumping units with the wellhead during well cementing, hydraulic fracturing, and other flushing and sales operations.
Reviews
There are no reviews yet.