Operating Environment | whole oil |
---|---|
Working Pressure, Mpa | 0,2 … 4.0 |
Quantity Of Wells Connected To The Landing, Units. | 30 |
Operating Environment Temperature, ºС | +5 … 65 |
Nominal Pipeline Size, mm | 100-150 |
Productive Capacity, m³/Day | 1 500 |
Environmental Temperature, ºС | – 50 … + 40 |
Explosive Indoor Zone Class According To Classification Of Electric Installation Code | В-1а |
Connection Scheme | With a two-way entrance for 30 wells |
Overall dimensions, mm | 3000х10500х3400 mm |
The manifold unit is designed for tying pumping units with the wellhead during well cementing, hydraulic fracturing, and other flushing and sales operations.
Category: All
Tag: Manifold unit
Be the first to review “Manifold unit” Cancel reply
Related products
-
Rated 0 out of 5
Automated block gas furnace PP-0,63, PP-0,63 A (track heater) with water coolant is designed for heating dehydrated oil, oil emulsions and water in oil fields
-
Rated 0 out of 5
The 3×4 working platform is intended for carrying out work during major well repairs using lifts A-50, UPA-60 and other lifts intended for well repairs.
-
Rated 0 out of 5
The rotor base is intended for installation of the drilling rotor, candles and is rigidly connected to the lifting platform on which the lifting unit…
Reviews
There are no reviews yet.