Operating Environment | whole oil |
---|---|
Working Pressure, Mpa | 0,2 … 4.0 |
Quantity Of Wells Connected To The Landing, Units. | 30 |
Operating Environment Temperature, ºС | +5 … 65 |
Nominal Pipeline Size, mm | 100-150 |
Productive Capacity, m³/Day | 1 500 |
Environmental Temperature, ºС | – 50 … + 40 |
Explosive Indoor Zone Class According To Classification Of Electric Installation Code | В-1а |
Connection Scheme | With a two-way entrance for 30 wells |
Overall dimensions, mm | 3000х10500х3400 mm |
The manifold unit is designed for tying pumping units with the wellhead during well cementing, hydraulic fracturing, and other flushing and sales operations.
Category: All
Tag: Manifold unit
Be the first to review “Manifold unit” Cancel reply
Related products
-
Rated 0 out of 5
According to the standards API Spec. 5 CT, API Spec. 5B GOST 633-80, 632-80, 34380-2017 ST RK ISO 11960-2009, 13679-2016 GOST R 56175-2014, 52203-2004, 53366-2009,…
-
Rated 0 out of 5
The circulation system is designed to operate with mud in the drilling rig and is preparing the drilling mud, a supply of drilling mud from…
-
Rated 0 out of 5
The rotor base is intended for installation of the drilling rotor, candles and is rigidly connected to the lifting platform on which the lifting unit…
Reviews
There are no reviews yet.